Project: Nellis AFB Building 725 Abatement
Las Vegas, NevadaDescription:
- Asbestos Abatement of barracks prior to
demolition
Project: Nevada Power Clark Station
Steam Generator Abatement
Las Vegas, Nevada
Description:
- Asbestos abatement of 3 large steam
generators including boiler towers and generator
stations. Required containment of 2 story generator buildings and 5 story
boilers.
Material removal included thermal system insulation throughout, interior
boiler
refractory and misc hazardous material removal throughout the facility.
Project: Shoreline Community College-Pagoda
Building
16101 Greenwood Ave N
Seattle, WA
Description:
- Asbestos abatement and selective
demolition of 50,000 SF historical building prior to renovation.
ACM included all flooring, concrete beam coating, limpid
asbestos fireproofing.
Project:
King County Courthouse Seismic
Upgrade Project
Description:
- Abatement of asbestos containing
piping, fireproofing, floor tile, mastic duct insulation, lead
containing plants, pigeon waste, installation of spray applied
acoustical in historic county courthouse building.
Project:
Savery Hall Abatement and Demolition
University of Washington CAmpus
Seattle, WA
Description:
- Asbestos and lead paint
abatement and interior demolition of $75,000 SF 3-story historic
University Lecture Hall prior to renovation. Work included
removal of virtually all hazardous materials, complete interior
gutting and major excavation for structural underpinning.
Project: Boeing Mech. Room Exterior
CAB Removal/Replacement
Auburn Plant, Auburn, WA
Boeing Building 3-830 CAB/Roof
Removal
E. Marginal Way, Boeing Field,
Seattle, WA
Description:
- Removal and replacement of
12,000 sf galbestos siding on penthouse mechanical room
exteriors on building 17-01, 09, 10Auburn Plant
Removal of 40,000 sf CAB siding and 45,000 non-friable roofing
on building 3-830 Boeing Field, Seattle
Project:
Washington Middle School
501 South 7th Street
Yakima, WA 98901
Description:
- Remove all asbestos/lead containing materials
throughout the school piping, CAB, VAT, boilers, etc.
Project:
Bellevue Schools - Various Locations
Bellevue, WA 98005
Description:
- Wilburton Service Center - 12,000 sf. Vinyl
Asbestos Tile and Mastic.
- Clyde Hill Elem - 4500 sf. Vinyl Asbestos
Tile and Mastic
- Medina Elementary - 5500 sf Vinyl Asbestos
Tile and Mastic
- Newport Heights Elementary - 6000 sf Vinyl
Asbestos Tile and Mastic
- Bellevue High School - 2000 sf Vinyl Asbestos
Tile and Mastic
- Chinook Middle School - Vinyl Asbestos Tile,
Pipe Insulation and Fillings
- Tyee Middle School - 2000 sf VAT/Mastic in
Gym Mezzanine
Project:
Washington Square Remodel Phase III
2501 E Street 5th and 6th floors
Bellingham, WA
Description:
- 22,000 sf popcorn ceiling and VAT/mastic
flooring in apartment units on 5th and 6th floors of 8 floor
complex
Project:
Swedish Medical Center
Seattle, WA
Description:
Scope of work varies with projects. All work is
performed on a time and material not to exceed basis. Types of
projects are as follows:
- Selective demolition
- Thermal systems insulation
- Carpet removal
- VAT/mastic
- Sheet vinyl flooring
- PCB’s
- Spray on fireproofing
Project:
Providence Hospital
Everett, WA
Description: Projects include:
- VAT/mastic/carpet/interior demo
- PCB’s/thermal pipe systems insulation